754 products

Fall Lawn Renovation: Seed, Feed & Aerate

Late August through mid-September is the stretch when a cool-season lawn actually responds: soil is still warm enough to germinate seed, summer weed pressure is falling off, and new roots get a full autumn to establish before the ground freezes.Everything a renovation needs is grouped here so you...

  • Free shipping
  • Secure checkout
  • Easy returns

Late August through mid-September is the stretch when a cool-season lawn actually responds: soil is still warm enough to germinate seed, summer weed pressure is falling off, and new roots get a full autumn to establish before the ground freezes.

Everything a renovation needs is grouped here so you can buy it in one pass instead of four trips: grass seed, a spreader that meters it evenly, a core aerator or plug remover, and lawn feed.

Two numbers decide your timing. Finish seeding at least 45 days before your area's average first hard freeze, and aerate before you seed, not after, so the seed drops into open holes. Always read and follow the label on any fertilizer or lawn product. Free US shipping.

754 products